Cattle Valley Close

Introduction

Construction of 6 lot residential subdivision
Client
Private
Location
Robertson

Pascall Group was engaged by a private client to complete a 6 lot residential subdivision in Robertson.

Scope

The scope of works included:

  • Clearing and grubbing.
  • Bulk earthworks including extensive cut to fill operations.
  • Erosion and sediment control.
  • Services installation including water, sewer, stormwater, electrical and communications.
  • Main access roadway including kerb and gutter and asphalting.
  • High level environmental controls including the construction of a bioretention basin. Includes planting, environmental testing and certification.
  • Construction of alternate access road to bioretention basin.
  • Blockwork retaining walls.
  • Minor concrete works including footpaths.
  • Linemarking and signage.
Back to Projects
envelopephone-handsetcrossmenuchevron-downarrow-left