Mount Vista Close

Introduction

Residential subdivision including decommissioning of dam
Client
Private
Location
Berry

Pascall Group was engaged by a private client to complete residential subdivision works at a property in Berry.

Scope

The scope of works included:

  • Extensive tree removals.
  • Decommissioning of an existing pond. Included high level environmental controls and testing.
  • Bulk earthworks to fill dam.
  • Subgrade preparation and pavement construction.
  • Pouring of concrete accessway.
  • Service install for length of accessway.
  • Various upgrades to stormwater run-off including overland and subsurface drainage.
  • All works required for client to finalise the subdivision including preparation and lodgement of documentation to Shoalhaven City Council.
Back to Projects
envelopephone-handsetcrossmenuchevron-downarrow-left